<tt id="6wcqe"></tt>
<acronym id="6wcqe"></acronym><acronym id="6wcqe"><center id="6wcqe"></center></acronym>
<rt id="6wcqe"><center id="6wcqe"></center></rt>
<sup id="6wcqe"><center id="6wcqe"></center></sup>
<rt id="6wcqe"></rt>
<acronym id="6wcqe"><center id="6wcqe"></center></acronym>
<acronym id="6wcqe"><div id="6wcqe"></div></acronym>
<sup id="6wcqe"><div id="6wcqe"></div></sup>

5.1 廣州地鐵一號線總體設計評估與咨詢 Technical Evaluation and Consultation on the General Design of Guangzhou Metro Line 1(1992-1993)

SYSTRA公司對中國境內公司(北京城建院、鐵二院、鐵四院)所作的廣州地鐵一號線總體設計進行全面技術評估。評估內容包括土建:車站設計,施工方法,安全措施,工程造價。地鐵系統:車輛,設備和工期籌劃等。提出了三卷咨詢報告。

SYSTRA made a comprehensive technical evaluation on the general design of Guangzhou Metro Line 1 made by Chinese design institute (Beijing Urban Construction Design and Research Institute, IN2 and IN4). The evaluation includes station design, construction methods, safety measures, and project construction cost for civil works and also rolling stock, system/equipment and construction planning, etc. Three volumes of the consultation report were presented.

 

5.2 廣州地鐵一號線初步設計技術咨詢 Technical Consultation on the Preliminary Design of Guangzhou Metro Line 1(1993-1994)

技術咨詢的內容包括審核初步設計報告,提出技術建議,優選技術方案,以保證工程質量、保證安全、降低投資。

The content of SYSTRA’s technical consultation includes reviewing the preliminary design report, making technical suggestions, and optimizing the technical scheme to ensure the quality of the project, guarantee the safety and reduce the investment.

 

5.3 南京地鐵土建及盾構施工技術咨詢 Technical Consultation on the Civil Work and Shield Tunneling Construction of Nanjing Metro(1995-1996)

根據法國SPIES公司與南京地鐵簽署的協議,SYSTRA公司參與了對南京地鐵建設的初期咨詢工作,主要咨詢內容為:土建施工,盾構施工及工程造價比較。

According to the agreement signed between French SPIES and Nanjing Metro, SYSTRA participated in the preliminary consulting work on the construction of Nanjing metro, the main consulting contents are: civil works, shield tunneling construction and project construction cost comparison.

 

5.4 上海莘閔輕軌設計技術咨詢 Technical Consultation on the Design of Shanghai Xingzhuang Light Rail(1999-2000)

審核由中方設計單位完成的設計,并提供優化設計的技術咨詢。包括:車站設計、站場規劃、結構形式、設備配置、運營組織,等。為業主節省數千萬投資。

SYSTRA made the review on the design completed by the Chinese design institute and provided technical consultation to optimize the design, including station design, station and depot planning, structural form, equipment configuration, operation organization, etc., which brought a saving of tens of millions of dollars for the client.

(點擊查看業績證明材料 Click to see the reference certificate)

 

5.5 上海市軌道交通6號線交通技術顧問服務 Technical consulting service on Shanghai Urban Railway Transport Line 6(2002-2003)

作為項目實施的前期研究,目標是合理估算客流、建設費用、運營和維修保養費用,吸引國內、外的投資。

As the preliminary research of the project implementation, the goal was to estimate reasonably the passenger flow, the construction cost, operation and maintenance cost, in order to attract domestic and foreign investment.

 

5.6 上海市市域快速鐵R3線運營總體原則技術咨詢 Technical Consultation on General Principles of Operation of Shanghai Urban Railway Transport Line R3(2003)

SYSTRA受聘參與了上海R3線的預可行性研究和工程可行性研究工作,運用先進的理念和經驗提供R3線運營方面的專業技術咨詢。

SYSTRA was entrusted by the client to participate in the pre-feasibility study and feasibility study of the urban railway transport line R3 in Shanghai, for which SYSTRA applied the advanced concepts and experience to provide professional technical consultation on the operation of the line R3.

 

5.7 廣州市軌道交通線網運營模式技術咨詢 Technical consultation on the operation mode of Guangzhou Railway Transport Network(2003-2004)

為保證線網建設的協調性、線網運營的合理性、節省工程和運營費用,SYSTRA對廣州軌道交通線網的運營模式進行科學研究,確定運營組織的總體原則。

In order to ensure the coordination of network construction, the rationality of network operation, and the saving of construction and operating costs, SYSTRA conducted scientific research on the operation mode of Guangzhou railway transport network and determined the overall principles of the operation organization.

(點擊查看業績證明材料 Click to see the reference certificate)

 

5.8 《京滬高速鐵路設計暫行規定》技術咨詢 Technical consultation on ?Provisional Specification on Beijing – Shanghai High Speed Railway Design ?(2003)

SYSTRA運用豐富的實踐經驗及完善的技術理念,對《暫規》上、下兩冊的各條款分別作出詳細咨詢,對其中的不妥條款進行分析及提出建議,對遺漏條款提出補充建議和說明。咨詢工作重點圍繞高速技術的先進性、可靠性,列車運行的安全性,旅客乘坐的舒適性及各系統間的協調性。

With rich practical experience and perfect technical concept, SYSTRA provided detailed consultation on the terms of the first and second volumes of ?Provisional Specification?, by analyzing the improper clauses and making supplementary suggestions and explanations for the missing clauses. The consulting work focuses on the advancement and reliability of high-speed technology, the safety of train operation, the comfort of passengers and the coordination between the systems.

(點擊查看業績證明材料 Click to see the reference certificate)

 

5.9 京滬高速鐵路(上?!暇┒危┕こ淘O計咨詢服務 Technical consulting service on Beijing – Shanghai High Speed Railway Design (Section Shanghai-Nanjing)(2003-2004)

針對京滬高速鐵路該區段工程設計技術方案,SYSTRA公司從該方案能否滿足本線列車和跨線列車共線高速、高密度運行的可行性等方面,分別從先進性、安全性、舒適性、可靠性、技術經濟合理性及系統性角度對該工程設計技術方案進行系統和重點工程方案的咨詢。

In view of the design technical scheme for this section of Beijing-Shanghai high-speed railway, SYSTRA studied whether the scheme can satisfy the feasibility of collinear high-speed and high-density operation of the line and cross-line trains. From the perspective of advancement, safety, comfort, reliability, technical and economic rationality and system integration, SYSTRA provided the systematic technical consultation on the design technical scheme of the project, especially for the key project scheme.

(點擊查看業績證明材料 Click to see the reference certificate)

 

5.10 上海10號線無人駕駛地鐵可行性咨詢 Technical consultation on the Automatic Driverless Metro System Feasibility of Shanghai Line 10(2004-2005)

SYSTRA應業主要求對上海市十號線采用全自動無人駕駛系統的可能性進行專題研究,咨詢內容涉及:全自動無人駕駛系統的發展、特殊性論述、本項目可行性、對土建和其它系統的要求、運營模式、工程籌劃等。

At the request of the client, SYSTRA conducted a thematic study on the possibility of adopting the fully automatic driverless system for urban railway transport line 10 in Shanghai. The consulting contents included: the development of the fully automatic driverless metro system, the particularity of this driverless system, the feasibility of the project, the requirements for civil works and other systems, the operation mode, and the construction planning, etc.

(點擊查看業績證明材料 Click to see the reference certificate)

 

5.11 上海軌道交通10號線全自動無人駕駛系統工程咨詢 Technical consultation on Automatic Driverless Metro System of Shanghai Line 10(2005-2008)

憑借豐富的全自動無人駕駛系統設計、建設和咨詢經驗,SYSTRA受業主委托,提供工程準備階段和系統設備采購階段的咨詢服務。

With extensive experience in the design, construction and consultation of fully automatic driverless metro systems, SYSTRA was entrusted by the client to provide consultation services during the project preparation stage and the system/equipment procurement stage.

 

5.12 上海軌道交通10號線全自動無人駕駛系統咨詢后續服務 Following-up Technical consultation on Automatic Driverless Metro System of Shanghai Line 10(2007-2011)

2007年11月業主委托SYSTRA公司開始后續階段的服務,主要提供技術決策和技術咨詢、安全評估、運營組織架構設計與運營前期籌備輔助以及多項專題研究和設計等服務。

In November 2007, the client entrusted SYSTRA to start the following-up services for Shanghai Urban Railway Transport Line 10, mainly including technical decision-making assistance and technical consulting, safety assessment, operation organization structure design and operation preparation assistance, as well as a number of thematic research and design services.

 

5.13 北京-天津城際軌道交通V=350公里/小時客運專線設計咨詢及施工監理 Design consultation and construction supervision on Beijing –Tianjin Intercity Railway Transport with V=350km/h(2005-2008)

本項目的工作內容涵蓋對整個工程設計文件(圖紙)的審查;并審查設計資料的總體性協調和專業間銜接;作為整個工程的技術總負責及現場施工總監,審查施工單位編制的施工組織方案;協助業主搞好項目管理,控制工程質量、工期和投資;參與系統調試、聯調和試運行。

SYSTRA’s consultation work of this project included the review of the entire engineering design document (drawings), the review of the overall coordination of design data and inter-disciplinary integration. SYSTRA, as the technical chief responsible for the whole project and site construction supervisor, made the review on the construction method prepared by the construction unit, assisted the client to manage the project, control the quality, duration and investment of the project, and also participated in system test, commissioning and trial running.

 

5.14 蘇州軌道交通一號線技術咨詢 Technical Consulting on Suzhou Urban Railway Transport Line 1(2003-2010)

繼蘇州軌道交通線網規劃項目之后,SYSTRA公司從2003年9月起為蘇州軌道交通一號線提供設計咨詢服務,審查由鐵四院完成的工程可行性研究、總體設計和初步設計(共提出7000多條建議)。2007年9月開始,SYSTRA繼續作為蘇州地鐵公司的技術顧問,編寫專題報告,提供土建、車輛和設備系統咨詢服務。

Following the Suzhou urban railway transport network planning project, SYSTRA undertook the design consulting services for Suzhou urban railway transport line 1 since September 2003 by making the review on the feasibility study, general design and preliminary design completed by Chinese design institute (providing more than 7,000 suggestions). Starting in September 2007, SYSTRA continued to serve as a technical consultant to Suzhou Metro Company, by preparing thematic research reports and providing consulting services for civil work, rolling stock and other system/equipment.

(點擊查看業績證明材料 Click to see the reference certificate)

 

5.15 上海市軌道交通11號線南段工程技術咨詢 Technical consultation on South Section of Shanghai Urban Railway Transport Line 11(2009-2013)

本項目咨詢的重點是運營模式及按快慢車組合運營模式滿足A型車最高運行速度為120km/h的特殊需求等。SYSTRA的咨詢工作內容涉及:高架結構和高架車站結構、運營方案、行車組織、軌道、聲屏障、接觸網及土建與設備系統之間的接口等方面。

The focus of technical consultation of this project is the operation mode and the combination operation mode of fast and slow trains to meet the special needs of type A train with the maximum operating speed of 120km/h. The consulting work of SYSTRA included: viaduct interstation and viaduct station structure, operation plan, train traffic organization, track, sound barrier, catenary and interface between civil works and system/equipment.

 

5.16 上海市軌道交通8號線三期工程初步設計咨詢服務 Technical Consulting Services on the Preliminary Design of Shanghai Urban Railway Transport Line 8 Phase III(2013-2015)

根據業主對各項初步設計的進度和招標工作的要求,負責編撰運營和維修的目標及需求書、RAMS目標/要求/工作管理計劃、其他各個分項系統(如信號、供電、OCC、安全門、綜合監控、車輛/車輛基地、核心系統集成等)的功能需求書及技術規格書,并對各分項系統的初步設計提供咨詢服務。

According to the client's requirements on the progress of preliminary design and the tendering work, SYSTRA was responsible for compiling the operation and maintenance objectives and requirements, RAMS objectives/requirements/work management plan, functional specifications and technical specifications of other sub-systems (such as signaling, power supply, OCC, platform screen door, ISCS, rolling stock/depot, core system integration, etc.), and provided consulting services for the preliminary design of each sub-system.

 

5.17 成都IT大道有軌電車初步設計階段咨詢服務 Technical Consulting Service for the preliminary design stage of Chengdu IT Avenue Tramway(2016)

具體工作內容主要針對成都IT大道有軌電車初步設計階段技術標準探討深化研究(包括法國標準規范體系,以及包括行車運營、軌道、路基、橋梁、供電、通信信號、車輛基地、交通安全等專業的技術標準研究,并提供國際項目設計實例詳細分析);初步設計智能化通行方案的咨詢研究,以及初步設計階段運營方案咨詢。

The specific work mainly focuses on the research of technical standards for the preliminary design of Chengdu IT Avenue Tramway (including French Standard and Norm system,as well as the technical standard in terms of train traffic operation, track, subgrade,bridge, power supply, telecommunication and signaling, depot, transport safety, provide the explanation of international pratical case ); consultation and research on the intellegent transport scheme of preliminary design stage, consultation on the operation plan of preliminary design stage.

污视频国产在线日,亚洲第一人a成网站,自拍偷拍一区二区三区,中文字幕一综合88久久,黄情网站在线观看观看免费